PLC Defaults Subtask
Use the PLC Defaults subtask to set up the default project and Project Labor Category (PLC) for the labor operation.
PLC Defaults
Field | Description |
---|---|
Project |
Enter, or click to select, a project to which you want to assign a default PLC. |
Project Labor Category |
Enter, or click to select, the PLC for this labor operation. The PLCs in the lookup are those that are assigned to the specified project. |
PLC Description |
This field displays the corresponding description for the PLC that you specify in the PLC field. |
Parent Topic: Subtasks of the Manage Labor Operations Screen