EBOM Components Subtask
Use this subtask to view the Engineering Bills of Material (EBOM) components of the selected part to be modified by the Engineering Change Notice (ECN).
If no components exist for the assembly part, you can copy components from an existing Manufacturing Bills of Material (MBOM) or EBOM assembly, or add new component lines manually.
EBOM Assembly
Field | Description |
---|---|
Part |
This field displays the part ID from the main screen. If the Action Code is Obsolete or Change on the main screen, this field displays the original part ID. If the Action Code is Add, Replace, or New Revision on the main screen, this field displays the change-to part ID. |
Rev |
This field displays the part revision from the main screen. |
Description |
This field displays the description associated with the part. |
EBOM Status |
From the drop-down list, select the EBOM status of the selected assembly part from the drop-down list. Valid options are:
The default is the value of part's assembly release flag. If the Action Code is Add, Replace, New Revision on the main screen, this field defaults with the value from the Change-To EBOM Status field on the main screen. If the Action Code is Change or Obsolete on the main screen and the Original Part is an EBOM assembly, this field defaults with the original part's BOM Status from the Manage Engineering Bills of Materials screen. All component parts must be released (that is, the Component Released field must be Y for all lines) in order for the EBOM Status to be Released. |
Part Status |
If the Action Code is Add, Replace, or New Revision for the selected line on the main screen, this field will default with the value from the Change-To Status field. If the Action Code is Change or Obsolete for the selected line in the main screen, this field will default with the value from the Original Part Status field. |
Part Lookup Type |
From the drop-down list, select the type of parts that you want to use for Lookups in the Component Part or Rev fields. Valid options are:
|
Part Security |
This field is visible only if the Use Part Data Security Controls check box is selected on the Configure Product Definition Settings screen, which indicates that the replacement part is subject to data security restrictions, as defined in the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR). If enabled, this field displays one of the following values to indicate whether the component part is subject to part data security restrictions and whether you have the necessary authorization to access information for that part:
Note:
The features in this release relating to Part Data Security are intended to assist your company in achieving ITAR compliance. However, it is each company’s responsibility to confirm that it is meeting its obligations with respect to ITAR or other applicable requirements. Deltek does not warrant that use of this functionality will result in compliance. |
Autoload All Components |
Click this button to automatically load all components from another EBOM. |
Copy In Effectivity Components |
Click this button to copy the effectivity components from another EBOM. |
Details
If the Action Code on the main screen is Obsolete or Change, the original part's EBOM components will default into this table window if the Original Part is an EBOM assembly. If the Action Code on the main screen is Add, Replace, or New Revision, the change-to part's EBOM components will default into this table window if the Change-to Part is an EBOM assembly. If no components exist for the Assembly Part, you can copy components from an existing MBOM or EBOM assembly, or add new component lines manually.
If the Action Code for a newly added line on the main screen is Replace, and both the Change-To Part and Original Part are EBOM assemblies, and the Copy Original Part Info field is selected, the Change-To Part will populate the Assembly Part field and its EBOM Components will default in the table window without an Action Code. However, if the Copy Original Part Info field is Y (Yes) and you open the EBOM Components subtask, the system displays the following message: Warning: If any rows are entered on this screen, no EBOM Component information will automatically be copied from the Original to the Change-To Part. If you select OK, the system displays another message giving you the option of setting the starting effective date to the current date and removing BOM lines that are no longer in effect in the EBOM Components screen. If you select No, the Action Code will be set to Add for all component part rows, and the Effective Starting Date and Effective Ending Date will remain as they exist in the EBOM. If you select Yes, all rows with an Effective Ending Date earlier than, or the same as, the Suggested Effective Date (on the Details tab) or system date (if the Suggested Effective Date is null) will be deleted when you save the record, and all other BOM rows' starting effective date will be changed to the Suggested Effective Date or system date (if the Suggested Effective Date is null).
Field | Description |
---|---|
Action Code |
From the drop-down list, select the action that this ECN will perform. Valid options are:
When you add a new line, the default action is Add. If the table window defaults with the EBOM components for the original part or change-to part, this field is blank depending on the Action Code on the main screen. |
Line |
Enter the line number to identify the specific EBOM component line. If the part in header has EBOM components, this field takes the value from BOM structure. |
Find No |
Enter, or click to select, the drawing find number used for this EBOM component line. Upon populating the Line field for a new line, this field will default with zeroes. For example, if you enter 3 in the Line field, the Find field will default to 0003. |
Component Part |
You can enter both standard and provisional parts in this field. Enter, click to select, the component part ID used on this EBOM line. This field must contain a valid part ID from the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts) in Costpoint Product Definition. If the part in the header already has EBOM components, this field populates from the BOM structure. You can add new components. |
Rev |
Enter, or click to select, the component part revision used on this EBOM line. This field must contain a revision that is part of a valid part/revision combination from the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts). |
Component Description |
This field displays a description of the component part. |
Part Security |
This field is visible only if the Use Part Data Security Controls check box is selected on the Configure Product Definition Settings screen, which indicates that the replacement part is subject to data security restrictions, as defined in the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR). If enabled, this field displays one of the following values to indicate whether the component part is subject to part data security restrictions and whether you have the necessary authorization to access information for that part:
|
Component Type |
From the drop-down list, select the component type code. Valid options are:
The default takes the code associated with the component part from the Manage Parts screen (for standard parts), or the Manage Provisional Parts screen (for provisional parts). |
Quantity Type |
From the drop-down list, select the quantity type code. Valid options are:
If you have selected the As Required check box on the Manage Parts screen for the component part, or the Component Type is Reference, the default for this field is As Required. If the Component Type is Tool, the default for this field is Per Order. Otherwise, the default is Per Assembly. |
Quantity |
Enter the component part quantity required in the EBOM. The default is 1. If the Quantity Type is As Required, the default is zero. |
U/M |
This field displays the inventory unit of measure for the component from the Manage Parts screen. |
Make/Buy |
From the drop-down list, select the option the indicates whether the part is to be manufactured or purchased. Valid options are:
|
Configuration |
Enter, or click to select, the ID of the configuration in which this component will be used when planning this EBOM. This field must contain a valid ID from the Manage Configuration Identifiers screen in Costpoint Bills of Material. If you did not select the Use Configuration IDs check box on the Configure Bills of Material Settings screen in Costpoint Bills of Material, this field is hidden. |
Configuration Description |
This field displays the configuration description. If you did not select the Use Configuration IDs check box on the Configure Bills of Material Settings screen, this field is hidden. |
Effective Starting Date |
Enter, or click to select, the effective date for this component in the EBOM. For new rows whose Action Code is Add, the default will be the Effective Date from the main screen. If the Effective Date is null, the Suggested Effective Date on the Details tab of the main screen displays. If the Action Code is blank and a component part exists, the EBOM component's Effective Starting Date displays. |
Effective Ending Date |
Enter, or click to select, the date on which this component will cease being effective in this EBOM. This field defaults with the EBOM component's Effective Ending Date (if the date exists). If the Action Code is Obsolete, this field defaults with the Suggested Effective Date from the Details tab on the main screen (if populated). |
Component Released |
Select this check box to release this component in this EBOM. The default value is determined by the option selected in the EBOM Release Control - Default Component Release Status in Bill group box on the Configure Bills of Material Settings screen. Note:
In an EBOM, provisional component parts can be released, and therefore the EBOM Status can be released. However, you cannot release provisional component parts in an ECN. You must convert the provisional part to a standard part in the Convert Provisional Part to Standard Part screen in Product Definition (and release it in the EBOM or ECN); otherwise, the EBOM Status field can be Unreleased only if a provisional component part row exists. |
Reference Designators |
If you did not select the Use Extended Length Reference Designators check box on the Configure Bills of Material Settings screen, enter up to 254 alphanumeric characters of reference designator text for this component on this assembly. This field is optional. However, if you selected the Use Extended Length Reference Designators check box, you can enter up to 32,000 alphanumeric characters in this field. This field displays any reference designator text that was assigned for the component part line in the Component Reference Designators subtask of the Manage Engineering Bills of Material or Release Engineering Bills of Material screen. |
Component Comments |
Enter any comments that relate to this EBOM component. This field displays any comments already entered for the EBOM component. |
Omit Requirements |
Select this check box to prevent material planning processes from planning this component. If the component is a Buy part, and the Component Type is not Buy With Component, this check box defaults as selected. If the Component Type is Reference or Tool, this check box also defaults as selected. |
Stop Explosion |
Select this check box to prevent material planning processes from planning any components of this subassembly part. If the Component Type is Reference or Tool, this defaults as selected. |
Scrap |
Enter the anticipated scrap percentage used when planning material requirements. The default takes value from the Manage Parts screen in Costpoint Product Definition. |
Copy Data |
Select this check box to copy all other original EBOM data to a new line. This check box defaults as not selected unless the component was copied from another EBOM. |
Provisional Part Type |
If the component part is a provisional part, this field displays the provisional part type that is assigned to the provisional part ID. You can modify this field only on the Manage Provisional Parts screen. Otherwise, this field is blank. |
Subtasks
Subtask | Description |
---|---|
Copy MBOM | Click this link to open the Copy MBOM subtask where you can copy a MBOM from another part/revision. This link is disabled if component lines already exist for the assembly part. |
Copy EBOM | Click this link to open the Copy EBOM subtask where you can copy an EBOM from another part/revision. This link is disabled if component lines already exist for the assembly part. |
- Related Topics:
- Copy MBOM Subtask
Use this subtask to copy an Manufacturing Bills of Material (MBOM) from another assembly part/revision. - Copy EBOM Subtask
Use this subtask to copy an Engineering Bills of Material (EBOM) from another part/revision. This subtask is disabled if component lines already exist for the assembly part.