Assign Project Planning Warehouses to Req and PO Lines
Use this screen if MRP planning is to be done by warehouse.
The toolkit loads the planning warehouse for an inventory project to all inventory requisition and PO lines that are assigned to that project that do not have a warehouse already loaded.
This toolkit will load the appropriate inventory project's planning warehouse to all inventory requisition and PO lines that do not have a warehouse. You should run this toolkit if you are planning to run MRP by warehouse (the Plan Warehouse Separately check box is selected in the Corporate Settings block of the Configure Material Requirements Planning Settings screen). Costpoint will select all requisition lines with a status of P, I, A, or R with no warehouse specified but with a specified inventory abbreviation. Costpoint will also select all purchase order lines with a status of P or O with no warehouse specified but with a specified inventory abbreviation. For each of these table rows, the system looks up the warehouse ID of the project associated with the specified inventory abbreviation and assigns it to the requisition or purchase order line.
Click to run this toolkit.
- Related Topics:
- Display the Assign Project Planning Warehouses to Req and PO Lines Screen
You access the Assign Project Planning Warehouses to Req and PO Lines screen from the Materials domain.