EBOM Components Subtask

This subtask displays the EBOM components for the provisional part (in the main screen table window) where it exists as an unreleased assembly.

Information displays on this subtask for the single EBOM level in which the provisional part exists for the given configurations and effective dates. You assign EBOM components to parts on the Manage Engineering Bills of Material and Release Engineering Bills of Material screens in Bills of Material.

Contents

This table window displays the component part information that is assigned to the provisional part in the Manage Engineering Bills of Material screen in Bills of Material. Both standard and provisional parts display if they are assigned to the EBOM assembly.

Field Description
Comp Line

This column displays the line number in which the component appears for the EBOM.

Find No

This column displays the find number in which the component appears for the EBOM.

Comp Part

This column displays the part ID of the component.

Comp Rev

This column displays the part revision (if applicable) of the component.

Comp Desc

This column displays the part description of the component.

Comp Part Status

This columns displays the component's status. For standard parts, the part status is established on the Manage Parts screen. Valid system-defined options are: Estimating, Obsolete, Pre-Release, Released and Phase-Out. This column displays Provisional for components that are provisional parts.

Prov Part Type

This column displays the provisional part type if the component part is a provisional part. Provisional part types are established on the Manage Provisional Part Types screen, and can be assigned on the Manage Provisional Parts screen.

Comp Type

This column displays the component type code for the EBOM:

  • B: Buy with Components
  • S: Standard
  • P: Phantom
  • R: Reference
  • T: Tool
  • D: Deleted

This required value defaults from the Manage Parts screen (for regular parts) or from the Manage Provisional Parts screen (for provisional parts).

Qty Type

This column displays the quantity type code that specifies how component requirements are calculated in the EBOM:

  • A: Per Assembly
  • O: Per Order
  • R: As Required
Quantity

This column displays the required component part quantity for the EBOM.

Inv U/M

This column displays the inventory unit of measure for the component from the Manage Parts screen (for standard parts), or the Manage Provisional Parts screen (for provisional parts).

Comp Make/Buy

This column displays M if the component is a Make part or B if it is a Buy part. This value defaults from the Manage Parts screen (for regular parts) or Manage Provisional Parts screen (for provisional parts).

Comp Release

This column displays Y (Yes) if the component has been released in this EBOM or N (No) if it is unreleased.

Comp Release Date

This column displays the date and time the component was released on this EBOM if the Comp Release column is Y. If the component is not released, this field is blank.

EBOM Exists

This column displays Y (Yes) if the component is a subassembly (that is, its own EBOM) or N (No) if it is not.

Comp EBOM Status

If the component is a subassembly (that is, its own EBOM, and the EBOM Exists column is Y), this column displays that EBOM's status: R if the EBOM is released or U if it is unreleased.

Configuration, Configuration Description

These columns display the configuration ID and configuration description for this EBOM. Configuration IDs are established on the Manage Configuration Identifiers screen in Bills of Material. If a configuration ID has not been assigned to this component part's EBOM, these columns will be blank.

Effective Starting Date

This column displays the date on which this component becomes effective in this EBOM.

Effective Ending Date

This column displays the date on which this component ceases to be effective in this EBOM.

Comp Comments

This column displays comments that apply to this EBOM component.

Last ECN

This column displays the date of the last engineering change notice for this part. This field is disabled if Engineering Change Notices is being used.

Scrap

This column displays the percentage (from 0.00 to 999.99) of this component that is expected to be lost when manufacturing this assembly. This value defaults from the Planning Details subtask of the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts).

Stop Explosion

This column displays Y (Yes) or N (No) to indicate whether or not the EBOM explosion proceeds to the next lower level of the subassembly.

Omit Requirements

This column displays Y (Yes) or N (No) to indicate whether or not the quantity requirements of that component are omitted during the EBOM explosion.