EBOM Components Subtask
Use this subtask to view the engineering bills of material (EBOM) components of the selected part to be modified by the ECN.
If no components exist for the assembly part, you can copy components from an existing manufacturing bills of material (MBOM) or EBOM assembly, or add new component lines manually.
EBOM Assembly
Field | Description |
---|---|
Part |
This field displays the part ID from the main screen. If the Action Code is Obsolete or Change in the main screen, this field displays the original part ID. If the Action Code is Add, Replace, or New Revision on the main screen, this field displays the change-to part ID. The part description displays in the unlabeled field beneath this field. |
Rev |
This field displays the part revision from the main screen. |
EBOM Status |
Select the EBOM status (Released or Unreleased) of the selected assembly part from the drop-down list. This field is required, but can be modified. The default is the value of part's assembly release flag. If the Action Code is Add, Replace, or New Revision on the main screen, this field defaults with the value from the Change-To EBOM Status field in the main screen. If the Action Code is Change or Obsolete on the main screen and the original part is an EBOM assembly, this field defaults with the original part's BOM Status from the Manage Engineering Bills of Material screen. All component parts must be released (that is, the Component Released field must be Y for all lines) for the EBOM Status to be Released. |
Part Status |
If the Action Code is Add, Replace, or New Revision for the selected line in the main screen, this field will default with the value from the Change-To Status field. If the Action Code is Change or Obsolete for the selected line in the main screen, this field will default with the value from the Original Part Status field. |
Part Lookup Type |
From the drop-down list, select the type of part that you want to view in the part Lookups. Valid options are:
|
Part Security |
This field is visible only if the Use Part Data Security Controls check box is selected on the Configure Product Definition Settings screen, which indicates that the replacement part is subject to data security restrictions, as defined in the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR). If enabled, this field displays one of the following values to indicate whether the component part is subject to part data security restrictions and whether you have the necessary authorization to access information for that part:
Note:
The features in this release relating to Part Data Security are intended to assist your company in achieving ITAR compliance. However, it is each company’s responsibility to confirm that it is meeting its obligations with respect to ITAR or other applicable requirements. Deltek does not warrant that use of this functionality will result in compliance. |
Autoload EBOM Components |
Click this button to load the EBOM component parts. |
Autoload Effective EBOM Components |
Click this button to load EBOM components that are in effectivity. |
Table Window
If the Action Code in the main screen is Obsolete or Change, the original part's EBOM components will load into this table window if the original part is an EBOM assembly. If the Action Code in the main screen is Add, Replace, or New Revision, the change-to part's EBOM components will default into this table window if the change-to part is an EBOM assembly. If no components exist for the Assembly Part, you can copy components from an existing MBOM or EBOM assembly, or add new component lines manually.
If the Action Code for a newly added line on the main screen Replace, and both the change-to part and original part are EBOM assemblies, and the Copy Original Part Info check box is not selected, the Change-To Part will populate the Assembly Part field and its EBOM components will load in the table window without an Action Code. However, if the Copy Original Part Info check box is selected and you open the EBOM Components subtask, the system displays the following message:
Warning: If any rows are entered on this screen, no EBOM Component information will automatically be copied from the Original to the Change-To Part.
If you select OK, the system displays another message giving you the option of setting the starting effective date to the current date and removing BOM lines that are no longer in effect in the EBOM Components screen. If you select No, the Action Code will be set to Add for all component part rows, and the Effective Starting Date and Effective Ending Date will remain as they exist in the EBOM. If you select Yes, all rows with an effective ending date earlier than, or the same as, the Suggested Effective Date (in the ECN Detail subtask) or system date (if the Suggested Effective Date is null) will be deleted when you save the record, and all other BOM rows' starting effective date will be changed to the Suggested Effective Date or system date (if the Suggested Effective Date is null).
Field | Description |
---|---|
Action Code |
From the drop-down list, the action this ECN will perform. Valid options are:
If you are adding a new line, the default is Add. If the table window defaults with the EBOM components for the original part or change-to part, this field is blank depending on the Action Code in the main screen. |
Line |
Enter up to four digits of the line number to identify the specific EBOM component line. If the part in header has EBOM components, this field takes the value from BOM structure. |
Find No |
Enter up to four alphanumeric characters of the drawing find number used for this EBOM component line. Upon populating the Line field for a new line, this field will default with zeroes, but can be modified. For example, if you enter 3 in the Line field, the Find field will default to 0003. This field is optional. |
Component Part |
You can enter both standard and provisional parts in this field. Enter, or click to select, the component part ID used on this EBOM line. This field must contain a valid part ID from the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts) in Costpoint Product Definition. If the part in the header already has EBOM components, this field populates from the BOM structure. You can add new components. |
Rev |
Enter, click to select, the component part revision used on this EBOM line. This optional field of up to three alphanumeric characters must be part of a valid part/revision combination from the Manage Parts screen (for standard parts) or the Manage Provisional Parts screen (for provisional parts). |
Component Type |
From the drop-down list, select the component type code. Valid options are:
The default takes the code associated with the component part from the Manage Parts screen (for standard parts), or the Manage Provisional Parts screen (for provisional parts). |
Quantity Type |
From the drop-down list, select the quantity type code. Valid options are:
If you have selected the As Required check box on the Manage Parts screen for the component part, or the Component Type is Reference, the default for this field is As Required. If the Component Type is Tool, the default for this field is Per Order. Otherwise, the default is Per Assembly. |
Quantity |
Enter up to 14 digits, including two digits after the decimal point, for the component part quantity required in the EBOM. The default is 1. If the Quantity Type is As Required, the default is zero. |
U/M |
This field displays the inventory unit of measure for the component from the Manage Parts screen. |
Make/Buy |
From the drop-down list, select whether the component will be manufactured or purchased. Valid options are:
The default value loads from the component part. |
Configuration |
Enter, or click to select, the ID of the configuration in which this component will be used when planning this EBOM. This field must contain a valid ID from the Manage Configuration Identifiers screen in Costpoint Bills of Material. If you did not select the Use Configuration IDs check box on the Configure Bills of Material Settings screen in Costpoint Bills of Material, this field is hidden. |
Configuration Description |
This field displays the configuration description. If you did not select the Use Configuration IDs check box on the Configure Bills of Materials screen, this field is hidden. |
Effective Starting Date |
Enter, or click to select, the effective date for this component in the EBOM. For new rows whose Action Code is Add, the default will be the Effective Date from the main screen. If the Effective Date is blank, the Suggested Effective Date on the Details tab displays. If the Action Code is blank and a component part exists, the EBOM component's Effective Starting Date displays. |
Effective Ending Date |
Enter, or click to select, the date on which this component will cease being effective in this EBOM. This field defaults with the EBOM component's Effective Ending Date (if the date exists). If the Action Code is Obsolete, this field defaults with the Suggested Effective Date from the Details tab (if populated). |
Component Released |
Select this check box to release this component in this EBOM. The default value is determined by the option selected in the EBOM Release Control - Default Component Release Status in Bill group box on the Configure Bills of Material screen. Note:
In an EBOM, provisional component parts can be released, and therefore the EBOM status can be released. However, you cannot release provisional component parts in an ECN. You must convert the provisional part to a standard part in the Convert Provisional Part to Standard Part application in Product Definition (and release it in the EBOM or ECN); otherwise, the EBOM Status field can be Unreleased only if a provisional component part row exists. |
Reference Designators |
If you did not select the Use Extended Length Reference Designators check box on the Configure Bills of Material screen, enter up to 254 alphanumeric characters of reference designator text for this component on this assembly. However, if you selected the Use Extended Length Reference Designators check box, you can enter up to 32,000 alphanumeric characters in this field. This field displays any reference designator text that was assigned for the component part line in the Component Reference Designators subtask of the Manage Engineering Bills of Material or Release Engineering Bills of Material screen. |
Component Comments |
Enter any related comments that apply to this EBOM component. This field displays any comments already entered for the EBOM component. This field is optional. |
Omit Requirements |
Select this check box to prevent material planning processes from planning this component. If the component is a buy part, and the Component Type is not Buy with Component, this check box defaults as selected. If the Component Type is Reference or Tool, this also defaults as selected. |
Stop Explosion |
Select this check box to prevent material planning processes from planning any components of this subassembly part. If the Component Type is Reference or Tool, this check box defaults selected. |
Scrap |
Enter the anticipated scrap percentage used when planning material requirements. The default takes value from the Manage Parts screen. |
Copy Data |
Select this check box to copy all other original EBOM data to a new line. This field is clear by default unless the component was copied from another EBOM. |
Component Description |
This field displays a description of the component part. |
Provisional Part Type |
If the component part is a provisional part, this field displays the provisional part type that is assigned to the provisional part ID. You can modify this field only Manage Provisional Parts screen. Otherwise, this field is blank. |
Subtasks
Subtask | Description |
---|---|
Copy MBOM | Click this link to open the Copy MBOM subtask,where you can copy an MBOM from another part/revision. This link is not active if component lines already exist for the assembly part. |
Copy EBOM | Click this link to open the Copy EBOM subtask, where you can copy an EBOM from another part/revision. This link is not active if component lines already exist for the Assembly Part. |
- Related Topics:
- Copy MBOM Subtask
Use this subtask to copy a manufacturing bills of material (MBOM) from another part/revision. - Copy EBOM Subtask
Use this subtask to copy an engineering bills of material (EBOM) from another assembly part/revision.