Cost Subtask

Use the Cost subtask to view inventory cost element information for the selected transaction line.

When creating an inventory transaction line for any MO Relief, the lower level unit costs for each cost element are calculated from the lower level relieved costs included in the unit price of a relief line. The calculation is based on the percentage of lower level costs that make up the total costs for a cost element on an MO. Include this amount on the inventory transaction line in the new lower level cost amount fields. These amounts are copied if the transaction is cloned and reversed.

If the Build To project (in the Allocations subtask of the Manage Manufacturing Orders screen) has a costing method of S (Standard), the cost of all quantity reliefs is determined by the standard costs for the build to part in the Manage Item Costs screen or Manage Project Item Costs screen in Product Definition.

Contents

Field Description
Relief ID

This field displays the Relief ID from the main screen.

Manufacturing Order

This field displays the MO number from the main screen.

MO Status

This field displays the MO Status as Planned, Firm Planned, Released, In-Shop, Completed, or Closed.

Build Part

This field displays the assembly part ID from the main screen. The part description displays in the unlabeled field below.

Rev

This field displays the revision, if applicable, of the selected part.

Warehouse

This field displays the warehouse in which the MO is being built.

Cost Type

This field displays the cost type being used. The value in this field defaults from the Inventory Valuation Method for the Build To inventory project/inventory abbreviation on the Accounting tab of the Manage Inventory Projects screen in Costpoint Inventory.

MO Total Costs

Field Description
Material (Direct)

The direct material total cost displays in this field.

Labor (Direct)

The direct labor total cost displays in this field.

Subcontract (Direct)

This field displays the direct subcontract total cost.

Misc 1 (Direct)

This field displays the direct miscellaneous 1 total cost.

Misc 2 (Direct)

This field displays the direct miscellaneous 2 total cost.

Total (Direct)

This field displays the direct total cost.

Hours

This field displays the total number of labor hours spent on this MO.

Material (Burden)

This field displays the burden material total cost.

Labor (Burden)

This field displays the burden labor total cost.

Subcontract (Burden)

This field displays the burden subcontract total cost.

Misc 1 (Burden)

The burden miscellaneous 1 total cost is displayed in this field.

Misc 2 (Burden)

The burden miscellaneous 2 total cost is displayed in this field.

Total (Burden)

The burden total cost is displayed in this field.

MO Prior Relief Costs

Field Description
Material (Direct)

The direct material relieved cost displays in this field.

Labor (Direct)

This field displays the direct labor relieved cost.

Subcontract (Direct)

This field displays the direct subcontract relieved cost.

Misc 1 (Direct)

This field displays the direct miscellaneous 1 relieved cost.

Misc 2 (Direct)

This field displays the direct miscellaneous 2 relieved cost.

Total (Direct)

This field displays the direct relieved total cost.

Material (Burden)

This field displays the burden material relieved cost.

Labor (Burden)

This field displays the burden labor relieved cost.

Subcontract (Burden)

The burden subcontract relieved cost displays in this field.

Misc 1 (Burden)

The burden miscellaneous 1 relieved cost displays in this field.

Misc 2 (Burden)

The burden miscellaneous 2 relieved cost displays in this field.

Total (Burden)

The burden relieved total cost displays in this field.