Copy Proposal Bills of Material
Use the Copy Proposal Bills of Material screen to create or overwrite proposal bills of material (PBOMs).
You can copy PBOMs from specified engineering BOMs (EBOMs), manufacturing BOMs (MBOMs), and other PBOMs.
This process supports multi-level BOM copies. For example, select the Proposal (All PBOMs) option as BOM Source to copy all PBOMs for a specified proposal to another proposal for proposal lines with the same end items. If the To PBOM already exists, you can overwrite the existing PBOM with the BOM in the From assembly.
Below is an outline of what is required when copying the BOM source:
BOM Source | Requirements (From) | Requirements (To) |
---|---|---|
Engineering BOM | From Assembly Part, Rev | To Assembly Proposal, Rev
To Assembly Part, Rev |
Manufacturing BOM | From Assembly Part, Rev | To Assembly Proposal, Rev
To Assembly Part, Rev |
Proposal BOM | From Assembly Proposal, Rev
From Assembly Part, Rev |
To Assembly Proposal, Rev
To Assembly Part, Rev |
Proposal (All PBOMs) | From Assembly Proposal, Rev | To Assembly Proposal, Rev |
Before running the application, click the Preview button found on the toolbar to preview the result.
When the copy process is complete and the To Assembly is updated, you must run the Compute Proposal Item Costs application for the proposal to calculate and roll up costs.
- Related Topics:
- Display the Copy Proposal Bills of Material Screen
You access the Copy Proposal Bills of Material screen from the Material domain. - Contents of the Copy Proposal Bills of Material Screen
Use the fields and options to configure the Copy Proposal Bills of Material screen. - Table Information for the Copy Proposal Bills of Material Screen
The Copy Proposal Bills of Material makes use of the following tables: - Subtask of Copy Proposal Bills of Material