Manage Manufacturing Bills of Material
Use this screen to set up and maintain the hierarchical relationship of parts in a production environment.
You can use it to develop manufacturing bills of material (MBOMs) one level at a time by specifying the parent part and listing first-level components and related data to create multi-level MBOMs. One part (or part/revision, if multiple revenues are allowed) can have multiple components on its MBOM. You can also include a part as a component on one or more MBOMs, and a parent on one MBOM can be a component on others.
You can copy engineering bills of materials (EBOMs) into MBOMs using the Copy Bills of Material screen in order to plan and control material operations. Conversely, you can copy an existing MBOM to an EBOM to make revisions in the design/engineering stage before releasing it back to manufacturing. This procedure is accessible only if you selected the Use Engineering Bills of Material check box in the Configure Bills of Material Settings screen.
The settings and default values in the Configure Bills of Material Settings screen affect how you can maintain and release MBOMs in this screen.
- If you did not select the Use Separate MBOM Release Function check box in the Configure Bills of Material Settings screen, you can maintain and release existing MBOMs in this screen (for example, adding new component lines and changing the setting in the Component Released check box) and in the Release Manufacturing Bills of Material screen.
- If you selected the Use Separate MBOM Release Function check box, you must use the Release Manufacturing Bills of Material screen to release existing unreleased MBOM assemblies and component line items. You can still add new component lines to unreleased MBOMs in this screen. However, they can be released only in the Release Manufacturing Bills of Material screen. You can also release multiple MBOMs in the Release Multiple Manufacturing Bills of Material screen.
If you selected the Release Mfg BOMs check box in the Configure Engineering Change Notice Settings screen in Costpoint Engineering Change Notices, you can release MBOMs only in the Manage Engineering Change Notices screen. If you selected the Modify Released Mfg BOMs check box, you can modify released MBOMs only in the Manage Engineering Change Notices screen.
Upon entering this screen, you are prompted to select MBOMs you want to view and edit. Use the Manufacturing BOM dialog box to search Costpoint for specific MBOMs by assembly part, revision, description, or BOM exist flag. If you search for a specific MBOM, this field displays in form view. If you use a wildcard to search for multiply MBOMs, this screen displays in table view. You can switch between the form and table view by clicking or .
- Related Topics:
- Display the Manage Manufacturing Bills of Material Screen
You access the Manage Manufacturing Bills of Material screen from the Materials domain. - Contents of the Manage Manufacturing Bills of Material Screen
Use the fields and options to configure the Manage Manufacturing Bills of Materials screen. - Table Information for Manage Manufacturing Bills of Material Screen
Changes to the Manage Manufacturing Bills of Material update several tables. - Subtasks of Manage Manufacturing Bills of Material
The Manage Manufacturing Bills of Material screen has the following subtasks: Configuration, Assembly Serial Numbers, Part Documents, Clone MBOM lines, Product Option Items, Reference Designators, Component Text, Alternate Parts, Substitute Parts, and Part Documents.