Contents of the View Part Inventory Screen

Use the fields and options to configure the View Part Inventory screen.

Contents

Field Description
Part

Enter, or click to select, a part ID. If you leave this field blank, Costpoint will not use part ID as a criterion for selecting inventory information to display.

Rev

Enter, or click to select, the desired revision for this part ID, or leave the field blank to view inventory information for all revisions of the selected parts.

Make/Buy

From the drop-down list, select Make or Buy to restrict the selection to make parts or buy parts. If you leave this field blank, Costpoint does not select parts by make/buy code.

U/M

This column displays the default or inventory unit of measure for the selected part.

Planner

Enter, or click to select, the planner ID you want to view inventory information for. If you specify a planner in this field, Costpoint checks the value in the Planner Assignment group box on Configure Production Control Settings to determine how to select inventory rows.

  • If you assign planners by part, it includes inventory information for all parts assigned to the entered planner ID.
  • If you assign planners by commodity code, it includes inventory information for all parts that have commodity codes assigned to the entered planner ID.
  • If you assign planners by project, it includes inventory information for all projects assigned to the entered planner ID.
  • If you assign planners by netting group, it includes inventory information for all projects linked to the netting groups assigned to the entered planner ID.
Project

To limit the inquiry to inventory for a single project, enter, or click to select, the project ID.

If you did not select the Exact Match option, you can enter a partial project number value and have Costpoint return inventory for all project IDs that meet the selection criteria value.

Netting Group

To limit the inquiry to a single netting group, enter, or click to select, the netting group ID. Netting groups are groups of inventory projects that will be planned together.

Include Inventory From Other Companies

This check box appears if you clear the Separate Items By Company check box in the Corporate Settings block of the Configure Product Definition Settings screen. (If you select the Separate Items By Company check box, this check box is hidden.)

Select this check box to include inventory from other companies and projects in the inquiry's result set. When Costpoint searches lower levels for inventory, order, requisition, requirement, and part/project information, lower-level rows also display from other companies.

If you clear this check box, only those project IDs that are linked to your user ID and company display in the result set.

Suppress Zero Quantity Rows

Select this check box if you do not want to view parts that currently have zero quantities for all inventory, on-hand, on-req, reserved, and owed. If you clear this check box, parts that have all zero quantities are not excluded from the query.

Part/Project Selection Criteria

Field Description
Exact Match

Select this option to find an exact match for the Part or Project text you entered.

Begins With

Select this option to find all items that begin with the Part or Project text you entered.

Ends With

Select this option to find all items that end with the Part or Project text you entered.

Contains

Select this option to find all items containing the Part or Project text you entered.

Part Inventory Inquiry

This table displays summary-level part information. To inquire at a more detailed level, select the line for which you want additional information and click the appropriate link at the bottom of the screen to open the subtask.

Field Description
Part

This column displays the part ID of the inventory record.

Rev

This field displays the revision number for the inventory record part. This column is hidden if you entered a Rev in the Search Criteria group box.

Description

This column displays a description of the inventory record part.

Part Security

This field is visible only if the Use Part Data Security Controls check box is selected on the Configure Product Definition Settings screen, which indicates that the assembly part is subject to data security restrictions, as defined in the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR).

If enabled, this field displays one of the following values to indicate whether the part you are accessing is subject to part data security restrictions and whether you have the necessary authorization to access information for that part:

  • Unrestricted: The part is not subject to data security restrictions.
  • Restricted: The part is subject to data security restrictions and you are authorized to access detailed part information.
  • ***UNAUTHORIZED***: The part is subject to data security restrictions and you are not authorized to access or view part information. This value is displayed in red background color.
Note: The features in this release relating to Part Data Security are intended to assist your company in achieving ITAR compliance. However, it is each company’s responsibility to confirm that it is meeting its obligations with respect to ITAR or other applicable requirements. Deltek does not warrant that use of this functionality will result in compliance.
U/M

This column displays the default or inventory unit of measure for the selected part.

Make/Buy

This field displays M (Make) or B (Buy) for the selected part.

Project

This column displays the project ID associated with the inventory record. This column does not display if the inquiry was limited to a single project.

Net Available Quantity

This column displays the number of parts for the selected part and project that are available for use. Costpoint calculates this value by adding the On Hand Quantity, In Inspection Quantity, In Shipping Quantity, On Order Quantity, Requisition Quantity, Owed Quantity, Planned Owed Qty, and In MRB Quantity (only if you selected the Incl MRB as Available Inventory check box on the Configure Production Control Settings screen), and then subtracting the Reserved and Planned Reserved quantities.

Current Available Qty

This column displays the currently available quantity for the part/project combination. It is the sum of on-hand and in-inspection quantities, minus the reserved quantity, for the part/inventory abbreviation combination.

On Hand Quantity

This column displays the quantity of parts for the selected part and project that are in On Hold locations.

In Inspection Quantity

This column displays the quantity of parts for the selected part and project that have been received but have not been accepted or rejected or that are in a reinspection location.

In MRB Quantity

This column displays the quantity of parts for the selected part and project that are in MRB (Material Review Board) locations.

In Shipping Quantity

This column displays the quantity of parts for the selected part and project that are in shipping locations.

On Order Quantity

This column displays the quantity of parts for the selected part and project that are on open purchase and manufacturing orders.

Requisition Quantity

This column displays the quantity of parts for the selected part and project that are on open purchase requisitions.

Reserved Quantity

This column displays the quantity of parts for the selected part and project that have been reserved by inventory reservations, manufacturing orders, and sales orders.

Owed Quantity

This column displays the quantity of parts for the selected part and project that are owed to it from another project (a transfer reservation).

Planned Reserved Qty

This column displays the quantity of parts for the selected project for inventory requests that have not been fully approved.

Planned Owed Qty

This column displays the quantity of parts for the selected project for inventory transfer requests that have not been fully approved.

On Hold Quantity

This column displays the quantity of parts for the selected part and project that are in On Hold locations.

Common Inventory

This column displays Y (Yes) or N (No) to indicate whether this is a company-owned, non-allocated inventory project.

Commodity

This column displays the commodity code for the inventory row's part.

Project Abbrev

This column displays the project abbreviation associated with the inventory record. This column does not display if the inquiry was limited to a single project.

Project Name

This column displays the project name associated with the inventory record. This column does not display if the inquiry was limited to a single project.

Netting Group

This column displays the netting group ID associated with the project on the selected line.

Allow Substitutes

This column displays Y (Yes) or N (No) to indicate whether substitute parts are allowed for the part and project on the row.

Forecast Qty

This column displays the sum of open sales and user-defined forecast quantities for the inventory record's part and project.

Lead Time Days

This is the total lead time (in days) that is calculated in the Planning subtask of the Manage Parts screen (in Costpoint Product Definition).

This quantity is used as the Master Production Schedule (MPS) time fence only if the MPS Settings – MPS Time Fence Method is set to Use Part Lead Time.

Buyer

This field displays the buyer ID assigned to the selected part.

Planner

This field displays the planner ID assigned to the selected part.

Default Warehouse

This field displays the default warehouse for the selected part.

Default Location

This field displays the default warehouse location for the selected part.

Order Policy

This field displays the order policy type. The order policy type represents the lot-sizing technique to be used for this part which can be one of the following:

  • Discrete Lot Size: This type has the MPS/MRP processes set the planned order quantity equal the quantity of the net requirements.
  • Min/Mult Lot Size: This type requires that the order quantity meet the minimum and multiple lot sizes specified for the part.
  • Order to Point: The Inventory Reorder Process will automatically place a purchase requisition for this part whenever the inventory quantity is less than or equal to the reorder point. It will order the quantity necessary to bring the quantity up to the Order to Point quantity. The Order to Point and Reorder Point are defined on the Manage Part Project Data screen in Product Definition.
  • Period: This type requires that the lot size equal net requirements for the specified number of calendar or shop days.
  • Reorder Point: The Inventory Reorder Process will automatically place a purchase requisition for this part whenever the quantity on hand is reduced to or below a specified level (reorder point level). The Reorder Point Quantity field on the Manage Parts screen will be used as the requisition's order quantity. The Order-To point and Reorder Point are defined on the Manage Part Project Data screen in Product Definition.
Multiple Lot Size

This field displays the number by which the lot size must be multiplied if the calculated planned order is to meet the net requirements for the selected part.

Period Order Days

This field displays the number of shop days for which Costpoint will combine net requirements to create a planned order for the selected part.

Planning Type

This field dipslays the planning type for this part:

  • [None]: The part has not been assigned a planning method.
  • MRP: The part will be planned by the Materials Requirement Planning process.
  • Reorder: The part will be planned using the Inventory reorder report.
  • MPS: The part will typically be planned by the Master Production Scheduling process, but can be planned by MRP if you select the Plan MPS Part Requirements check box on the Configure Materials Requirements Planning Settings screen.
Reorder Quantity

This field displays the reorder quantity for the selected part from the Manage Parts screen in Costpoint Product Definition.

Subtasks

Subtask Description
Inv Abbrev Click this link to open the Inv Abbrev subtask to view inventory abbreviation detail for the selected part/project.
Proj Loc Click this link to open the Proj Loc subtask to view the inventory abbreviation location detail for a selected part.
Sub Parts Click this link to open the Sub Parts subtask to view current inventory information for the substitute part of the selected part/project.
Inv POs Click this link to open the Inv POs subtask to view inventory purchase order line for the selected part.
Requirements Click this link to open the Requirements subtask to view requirements/reservations about the selected part.
Part Locations Click this link to open the Part Locations subtask to view location detail for the selected part, across all projects.
Planning Click this link to open the Planning subtask to view planning information for the part on the selected inventory record.
Requisitions Click this link to open the Requisitions subtask to view open requisition information for a selected part/project.
Forecasts Click this link to open the Forecasts subtask to review MPS forecast quantities for selected parts and projects.
Non-Inv POs Click this link to open the Non-Inv POs subtask to view the orders for the selected part that are not associated with any inventory abbreviation.
MOs Click this link to open the MOs subtask to view open manufacturing order (MO) detail for a selected inventory record
Plnd Orders Click this link to open the Plnd Orders subtask to view details about the MRP- and MPS-generated planned orders for the selected inventory record's part and project
Plnd Rqmts Click this link to open the Plnd Rqmts subtask to view details about the MPR- and MPS-generated planned demand created by planned orders
ECNs Click this link to open the ECNs subtask to view all engineering change notices (regardless of status) referencing the part selected.
Part Documents Click this link to open the Part Documents subtask to view the documents assigned part.
Proj Sub Parts Click this link to open the Proj Sub Parts subtask to view the current inventory information for the substitute part of a selected project.