Contents of the Configure Materials Estimating Settings Screen
Use the fields and options to configure the Configure Materials Estimating Settings screen.
Proposal Item Cost Rules
Use this group box to specify the types of data that Costpoint should identify as potential cost sources for proposal items. You can also specify whether or not certain cost data values can be excluded based on their age. Except for the Include Archived PO History and Rollup Purchasing Line Charges in Unit Costs check boxes, most of the settings in this group box default to the proposal record, and you can override them for the proposal on the Details tab of the Manage Proposals screen. The settings in this group box also affect the Compute Proposal Item Costs process.
Field | Description |
---|---|
Include Expired Vendor Quotes |
Select this check box to have Costpoint include expired vendor quotes when it looks up item cost data. |
Quote Expiration Date Cutoff (Calendar Days) |
Enter the number of days before the proposal start date in which expired quotes are considered. |
PO Order Date Cutoff (Calendar Days) |
Enter the number of days before the proposal start date in which purchase order (PO) dates are considered. |
Include Archived PO History |
Select this check box to have Costpoint include archived PO history when it looks up item cost data. |
Rollup Purchasing Line Charges in Unit Costs |
Select this check box to have Costpoint include PO line charges when it looks up item cost data. |
MO Order Date Cutoff (Calendar Days) |
Enter the number of days before the proposal start date in which manufacturing order (MO) dates are considered. |
Include Orders/Quotes for Quantities Larger than Item Breakpoint Quantities |
Select this check box to have Costpoint include orders and quotes with quantities that are larger than the breakpoint quantities when it looks up item cost data. |
PBOM Explosions
Use this group box to define which component parts are loaded for a given proposal line on the Manage Proposal BOM Cost Estimates - Indented and Manage Proposal BOM Cost Estimates - Summarized screens. Before working with cost estimates, you must establish PBOM component rows on the Manage Proposal Bills of Material screen. Select from this group box the PBOM components you want to include in the costing process.
You cannot override these selections on the Manage Proposals screen.
Field | Description |
---|---|
Include Tooling Parts |
Select this check box to include tooling parts in PBOMs and cost calculations. If you do not select this check box, Costpoint will not load component parts (and their lower-level components) that have Component Type of T (Tooling) when displaying and costing PBOM rows. |
Include Reference Parts |
Select this check box to include reference parts in PBOMs and cost calculations. If you do not select this check box, Costpoint will not load component parts (or their lower-level components) that have Component Type of R (Reference) when displaying and costing PBOM rows. |
Include Components Below a Stop-Explosion Subassembly |
Select this check box to include components below a stop-explosion part in PBOMs and cost calculations. If you do not select this check box, and the Stop Explosion field for the component part on the Manage Proposal Bills of Material screen is Y, Costpoint will load only the component, and not its lower-level components, when displaying and costing PBOM rows. |
Include Omit Requirements Parts |
Select this check box to include "omit requirements" components in PBOMs and cost calculations. If you do not select this check box, and the Omit Requirements check box of the component part on the Manage Proposal Bills of Material screen is selected, Costpoint will not load the component, or its lower-level components, when displaying and costing PBOM rows. |
Include Floor-Stock Parts |
Select this check box to include floor stock parts in PBOMs and cost calculations. If you do not select this check box, and the Floor Stock check box is selected for the component part in the Planning subtask on the Manage Parts screen, Costpoint will not load the component, or its lower-level components, when displaying and costing PBOM rows. |
Include Scrap and Yield Factors |
Select this check box to include scrap and yield factors when you calculate PBOM requirements. You can override this selection on the Compute Proposal Item Costs screen. |
Use Min/Mult Lot Sizes for Components |
Select this check box if you want required quantities for a part to be increased to meet that part's minimum/multiple lot sizing rules when determining costs. |