Contents of the Copy Master Production Schedules Screen
Use the fields and options to configure the Copy Master Production Schedules screen.
Selection Ranges
From Forecasts
Field | Description |
---|---|
MPS Plan |
Enter, or click
Enter P (for Production) if you want to copy data from the official production plan. Enter a different code to copy data from a "what-if" scenario. |
Part/Rev
Use these options to specify which inventory abbreviations to copy MPS forecast requirements from.
Field | Description |
---|---|
Option |
From the drop-down list, select the range of parts/part revisions to be included. Valid options are:
|
Start |
Enter, or click
If you do not select One as the Option setting, Costpoint automatically uses the part/revision from the original forecast requirement on the new record generated from it. This field is disabled if the Allow Multiple Revisions for Each Item check box is not selected on the Corporate Settings block of the Configure Product Definition Settings screen. |
End |
Enter, or click
This field is disabled if the Allow Multiple Revisions for Each Item check box is not selected on the Corporate Settings block of the Configure Product Definition Settings screen. |
Include Product Family |
Select this check box to copy product family parts linked to this MPS part. (A product family is defined by all item products with the same MPS Planning Part on the Manage Item Billings screen in Product Definition.) This option is available only if you select One as the Start Option. If you select the Include Product Family check box, Costpoint uses the part/revision from the original forecast requirement on the new record generated from it. |
Inventory Abbrev
Use these options to specify which inventory abbreviations to copy MPS forecast requirements from.
Field | Description |
---|---|
Option |
From the drop-down list, select the range of inventory abbreviations to be included. Valid options are:
If you do not select One as the Option, you cannot specify an Inventory Abbrev in the To Forecasts group box. Costpoint uses the inventory abbreviation from the original forecast requirement on the new record generated from it. |
Start |
Enter, or click
|
End |
Enter, or click
|
Forecast Need Date
Use these options to specify forecast need dates to copy MPS forecasts from.
Field | Description |
---|---|
From the drop-down list, select the range of inventory abbreviations to be included. Valid options are:
If you select All as the Option, you cannot specify a Starting Forecast Need Date for the new forecast records. Costpoint uses the need date from the original forecast requirement on the new record generated from it. |
|
Start |
Enter the date that is the starting point of the range. If you select All or From Beginning in the Option field, this field is not available. |
End |
Enter the date that is the end point of the range. If you select All or From Beginning in the Option field, this field is not available. |
Warehouse
If you selected the Plan Warehouse Separately option (on the Corporate Settings block of the Configure Material Requirements Planning Settings screen), Costpoint plans supply and demand records separately for each warehouse.
If the Plan Warehouse Separately option is not selected, Costpoint does not plan supply and demand by warehouse and this option is not available to you.
Use the options in this group box to specify which warehouses to copy MPS forecasts from.
Field | Description |
---|---|
Option |
From the drop-down list, select the range of inventory abbreviations to be included. Valid options are:
If you do not select One as the range option, you cannot specify a Warehouse in the To Forecasts group box. Costpoint will use the warehouse from the original forecast requirement on the new record generated from it. |
Start |
Enter, or click
|
End |
Enter, or click
|
Generate
To Forecasts
Field | Description |
---|---|
MPS Plan |
Enter, or click
Enter P (for Production) if you want to copy data to the official production plan. Enter a different code to copy data to a "what-if" scenario. |
Overwrite Existing Forecasts |
Select this check box if you want Costpoint to overwrite any existing forecast data for the MPS plan with forecast data from the plan named at the top of the screen, in the MPS Plan field within the From Forecasts group box.
|
Part |
Enter, or click
This field is disabled if the Part/Rev Option does not equal One, or if the Include Product Family Parts check box is selected (the part/revision on any copied forecast requirement is included in the new forecast records). |
Rev |
Enter, or click
This field is disabled if the Part/Rev Option equals One, or if the Include Product Family Parts check box is selected. This field is disabled if the Allow Multiple Revisions for Each Item option is not selected on the Corporate Settings block of the Configure Product Definition Settings screen. |
Inventory Abbrev |
Enter, or click
This field is disabled if the Inv Abbrev Option does not equal One. |
Starting Forecast Need Date |
Enter, or click
This field is disabled if the Forecast Need Date Option equals All. If you enter a starting date, new records are based on the difference between the From Forecast Need Date and the earliest need date for the forecasts being copied. For instance, if you entered a starting need date of July 1, 2008 and the earliest need date of the copied forecast requirements is January 1, 2008, Costpoint adds six months to the original record's need date for each new forecast requirement row. If you do not specify a date in this field, the process does not select any past due forecast requirements. |
Warehouse |
Enter, or click
This field is disabled if the Warehouse Option is not One. |
Subtask
Subtask | Description |
---|---|
Review Copied MPS Forecasts | Click this link to access the Review Copied MPS Forecasts subtask, where you can review all data before committing the modifications to the database.
You must complete the process successfully in order to see data on the review subtask. |