Additional Info Tab
Use the Additional Info tab to enter additional detail for a selected manufacturing order.
Contents
Field | Description |
---|---|
Organization |
Enter, or use to select, the ID of the organization assigned to the manufacturing order. |
Org Abbrev |
Enter, or use to select, the abbreviation of the organization ID assigned to the manufacturing order. The name displays in the unmarked field to the right. |
Order Reference |
This field displays the order with which the MO is referenced. |
Order Ref Type |
This field displays the type of order referenced. |
Discrepancy ID |
This field displays the discrepancy ID for which the rework order is requested by Manufacturing Execution (MES). |
Discrepancy Line |
This field displays the discrepancy line number for which the rework order is requested by MES. |
Yield | This field displays the estimated yield percentage for the selected parent part. |
Percent Complete | This field displays the percentage of completion as updated by the MO Completions or MO QC Inspections applications. |
Net Build Quantity |
This field displays the expected net build quantity for this MO. It is equal to the product of the Build Quantity and Yield fields. |
DPAS Rating | This field displays the DPAS rating from the Build Project of the manufacturing order (MO). |
Priority |
Enter a number between 1 and 10 to indicate the priority of the manufacturing order. |
Assembly Job |
Select this check box to flag the manufacturing order as an assembly job for advanced planning and scheduling purposes. |
Activity
Field | Description |
---|---|
Allow Additional Material Issues |
Select this check box to indicate that additional material issues are allowed for this manufacturing order. |
Material Issues |
This field displays Y (Yes) or N (No) to indicate whether or not material issues have taken place for the manufacturing order. |
Allow Additional Timesheet Charges |
Select this check box to indicate that additional timesheet entries are allowed for this manufacturing order. |
Timesheets |
This field displays Y (Yes) or N (No) to indicate whether or not additional timesheet charges have taken place for the manufacturing order. |
Allow Subcontracts |
Select this check box to indicate that additional subcontracts are allowed for this manufacturing order. |
Subcontract Charges |
This field displays Y (Yes) or N (No) to indicate whether or not subcontract charges have taken place for the manufacturing order. |
Document Package
Field | Description |
---|---|
Pick List (Include) |
Select this check box to print a pick list for this manufacturing order. |
Pick List (Printed) |
Select this check box to treat this manufacturing order's pick list as printed. |
Assembly Sheet (Include) |
Select this check box to print an assembly sheet of components/subassemblies for this manufacturing order. |
Assembly Sheet (Printed) |
Select this check box to treat this manufacturing order's assembly sheet as printed. |
Routing Traveler (Include) |
Select this check box to print a routing traveler for this manufacturing order. |
Routing Traveler ( Printed) |
Select this check box to treat this manufacturing order's routing traveler as printed. |
Component Labels (Include) |
Select this check box to print component labels for this manufacturing order's requirements. |
Component Labels ( Printed) |
Select this check box to treat the component labels as printed |
Configuration List (Include) |
Select this check box to print an as-built configuration list for this manufacturing order. |
Configuration List ( Printed) |
Select this check box to treat the as-built configuration list as printed. |