Burdened Labor and ODC’s Report

The Burdened Labor and ODC's report displays the burdened costs by resource for labor, and by account for non-labor, by project; information that was previously unavailable in Costpoint.

This report utilizes specific tables, which need to be created by a specific process in Costpoint, relating to Deltek Cobra integration. Refer to the user guide for more details about specific setup instructions before running this report.

Note: Before you run this report, data that coincides with the prompts you select must exist in the CB_SUM and CB_BURD_SUM tables. These tables are populated during the Compute Cobra Burden Costs process, for projects that are identified as Cobra programs. This means that if you want to run a report that includes data for certain projects for Fiscal Year 2007, Period 10, Subperiod 1, you must first run the Compute Cobra Burden Costs process for these projects for Fiscal Year 2007, Period 10, Subperiod 1.

A project is identified as a Cobra program by checking the Cobra Program check box on the Manage Project User Flow screen in Costpoint. This option can only be selected at the top level of the project and if selected, the entire project tree will be included in the Compute Cobra Burden Costs process.