Contents of the Manage Cobra Project Mapping Screen
Use the fields and options to configure the Manage Cobra Project Mapping screen.
Table Window
Use this table window to enter the links between Costpoint and Cobra projects. If you selected the Use Mapping Table option on the Configure Cobra Interface Settings screen, you must link all Costpoint projects (that have been identified as Cobra projects) to existing Cobra projects. You can identify Costpoint projects as Cobra projects by selecting the Cobra Project check box on the Manage Project User Flow screen. If you selected the Costpoint Top Level Project = Cobra Project option, then you must only enter the exceptions in this table. Multiple Costpoint projects may be mapped to the same Cobra project; however, a Costpoint project can be mapped to only one Cobra project.
Field | Description |
---|---|
Cobra Project |
Enter, or click to select, the Cobra project that you want to map to a Costpoint project. Note: is only available if you have entered the connection information in the
Cobra Software Location field of the Configure Cobra Interface Settings screen. You must enter Cobra projects manually if no connection information is available.
|
Costpoint Project |
Enter the Costpoint project that you want to map to a Cobra Project. You can only map a Costpoint project once on this screen. An error message displays if the Costpoint project already exists in the table. Also, you cannot map higher-level nodes if lower-level nodes have already been mapped. Note: You must select the
Cobra Project check box on the Manage Project User Flow screen if you want to map a Costpoint project to a Cobra project. Projects that do not have the
Cobra Project check box selected are valid for this screen and are not available in
. An error message displays if you enter a project that has not been identified as a Cobra project.
|
Costpoint Project Level___and Above |
Enter, or click to select, the highest level of the Costpoint project number to which you want data to be summarized. |